Jump to content

Welcome to Field to Farm Community
Register now to gain access to all of our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, post status updates, manage your profile and so much more. If you already have an account, login here - otherwise create an account for free today!
Photo

Services


  • Please log in to reply
11 replies to this topic

#1
jazziejay

jazziejay

    Goose

  • Book Owners
  • PipPip
  • 52 posts
  • Locationnorfolk
Hi im on a mission now to get things sorted on the land really wanting water for the winter (borehole) and electric. Need electric to pump the borehole but its so confusing they want to know how much kva i need! How do i work that out or what should i say as a rough guide?
i put planning in for a mobile home but withdrew it, i think i need to get a planning consultant on the case as i decided to put in for a road frontage entrance but needed to prove a 215m visability splay! Any guidance on getting sorted would be great.
  • 0

#2
elegantstorm

elegantstorm

    Wurzel

  • Book Owners
  • PipPipPipPip
  • 279 posts

Electric will depend on your long term needs and aims.  A static caravan comes with a 16 amp plug, but a mobile home or house it's down to how much electric you might be using.  Even in our static, we put a better supply in and installed electric heating throughout cos it's cheaper than bottled gas and you don't get the damp you do from calor fires.

If long term you want a house then I would suggest you want a standard 100 amp household supply installing so it's man enough for later on.  Of course if you're going with geothermal heating and solar panels for hotwater then your electric needs may not be as great, but also consider your business needs - you may need electric there.  We had three phase put in because it was little extra and gives maximum possibilities and power.

On what grounds are you siting your mobile home?

How is your access currently to your land and off what type of road?  Are you looking to move your entrance?


  • 0

#3
Groundhog

Groundhog

    Member

  • Book Owners
  • PipPipPipPipPip
  • 1,081 posts

do you already have an entrance in the current position ?


  • 0

#4
jazziejay

jazziejay

    Goose

  • Book Owners
  • PipPip
  • 52 posts
  • Locationnorfolk
Hi yes i have an entrance off a track but its quite limiting as to what i can do with the land. Ive had a quote today for a borehole in the region of £5000 i think thats quite pricey. What is others opinion?
  • 0

#5
boiow

boiow

    Lord of the Manor

  • Book Owners
  • PipPipPipPipPip
  • 511 posts

why don't you drill your own.   


  • 0

#6
Cornish Gems

Cornish Gems

    Lord and Lady of the Manor

  • Book Owners
  • PipPipPipPipPip
  • 1,597 posts
  • LocationCornwall (formerly Devon)

Who owns the track?

 

The price for the bore hole seems pricey unless that includes lining, manhole cover and filtration at the top of the riser etc, A basic bore hole should cost in the region of £3k depending upon how deep they think they will have to go to get a decent amount of water.  On our land, the owners found out the best place to drill a borehole and then got someone in to make the hole. THEN they installed a pump, etc themselves and did the whole job for a lot less than had been quoted. However, at some stage we are going to have to install a proper filtration system instead of the temporary one we have at the moment. 

 

BTW planning said we needed permission before we could put a shelter over the borehole, etc but did say that it could be done under pd.


  • 0

#7
jazziejay

jazziejay

    Goose

  • Book Owners
  • PipPip
  • 52 posts
  • Locationnorfolk
The track is a public bridleway but owned by the farmer opposite! He thinks he owns the hedgerow surrounding my land too. He doesnt like change!
  • 0

#8
Groundhog

Groundhog

    Member

  • Book Owners
  • PipPipPipPipPip
  • 1,081 posts

If you already have an entrance you dont have a problem because it is an existing agric entrance which you can use 24/7 for agric use,a mobile is anxilary to agriculture ! You are STAYING(not living)in it for permitted agricultural purposes so the use is agricultural .Only when you apply for residential can they kick off and then you will have to adhere to the street plan document and speed/distances etc.If the farmer owns the lane which the bridal path is on then it could be said that indeed it is his hedge,if it were a road that would be different.hedges are usualy down the middle or where there is a ditch on one side it is to the centre of the ditch.But no set rules other than what would is in deeds or land registry


  • 0

#9
adrian007

adrian007

    Farmer Giles

  • Book Owners
  • PipPipPipPip
  • 422 posts

Can I do a little thread hijack?

 

What's the differnce between 3 phase and 1 phase  - in practical terms I guess, what can't I do with single phase?


  • 0

#10
elegantstorm

elegantstorm

    Wurzel

  • Book Owners
  • PipPipPipPip
  • 279 posts

Single phase (1x240volts) is what's connected to most domestic houses - usually giving you a 100amp supply though some areas only give an 80 amp supply.

Three phase is 3x single phase supplies - so 300 amps, or used with certain equipment it's gives 415 volts for three phase equipment.  Some motors and welders are three phase.  Three phase motors run cooler so like for a roller shutter a single phase motor is fine for occasional use but would overheat and cutout if used tooregularly, three phase will work all day.

It also gives more options on equipment - we picked up a three phase walk in freezer for not alot - it didn't fetch much on bidding because many people don't have three phase.  Car ramps, welders, pillar drills can all be picked up cheaper in three phase but are better quality than single phase.

If you're getting a quote it's worth asking for both and compare the price and it's not usually much extra nut increases possibilities.

 


  • 0

#11
jazziejay

jazziejay

    Goose

  • Book Owners
  • PipPip
  • 52 posts
  • Locationnorfolk
Ok so quotes in £8500 to have electric put on via a single phase transformer off a pole on my field... As opposed to £1100 from the lane opposite had the people opposite given permission! There are no words to describe how i feel about those people. However now i know where i stand. What you think of that quote pls guys?
  • 0

#12
Cornish Gems

Cornish Gems

    Lord and Lady of the Manor

  • Book Owners
  • PipPipPipPipPip
  • 1,597 posts
  • LocationCornwall (formerly Devon)

How much of that quote is 'contestable'? Also, if you need a transformer, ask them how much a refurbished transformer would be as the price they quote is usually for a brand spanking new one!


  • 0